Mixed-Use Development Master Report
Sector: Car parking • Location: Ontario, California, United States of America
Source: Dodge
construct a mixed-use development consisting of two (2) 8-story office/commercial buildings totaling 145,576 square feet, one (1) 13-story building with 159,698 square feet of commercial space and 68 residential dwelling units, and two (2) 6-level (5-story) parking structures
- Status
- Prospective
- Sector
- Car parking, Commercial, Automotive, Residential, Manufacturing (Industrial), Consumer Products
- Location
- Ontario, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Mixed-Use Development Master Report
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | design development |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | construct a mixed-use development consisting of two (2) 8-story office/commercial buildings totaling 145,576 square feet, one (1) 13-story building with 159,698 square feet of commercial space and 68 residential dwelling units, and two (2) 6-level (5-story) parking structures |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Ontario |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Car parking, Commercial, Automotive, Residential, Manufacturing (Industrial), Consumer Products |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
