Mixed-Use Development-Parking Garage-Swimming Pool
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
construction of a three-to-five-story, 254,152- square-foot development comprised of two buildings oriented at the north and south side of the project site. The development will include 263 residential units, including 41 affordable housing units, 14,346 square feet of office space, a pocket park and subterranean parking. - parking structure sf is estimate
- Status
- Prospective
- Sector
- Consumer Products, Residential, Car parking, Manufacturing (Industrial), Commercial, Automotive
- Location
- Pasadena, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Mixed-Use Development-Parking Garage-Swimming Pool
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | construction of a three-to-five-story, 254,152- square-foot development comprised of two buildings oriented at the north and south side of the project site. The development will include 263 residential units, including 41 affordable housing units, 14,346 square feet of office space, a pocket park and subterranean parking. - parking structure sf is estimate |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Pasadena |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Residential, Car parking, Manufacturing (Industrial), Commercial, Automotive |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
