Mixed-Use Development (Residential & Commercial)
One of 10,000+ projects Taiyo tracks in Texas.
Source: Dodge USA
Construction of a mixed-use development with residential and commercial uses on Lot 15B of NCB 1262, one lot containing approximately 4.16 acres of land located south of the intersection of North Northwest Loop 323 and Garden Valley Road (1405 North Northwest Loop 323).
- Status
- Prospective
- Sector
- Commercial, Consumer Products, Residential, Road, Manufacturing (Industrial)
- Location
- Tyler, Texas, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Mixed-Use Development (Residential & Commercial)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Construction of a mixed-use development with residential and commercial uses on Lot 15B of NCB 1262, one lot containing approximately 4.16 acres of land located south of the intersection of North Northwest Loop 323 and Garden Valley Road (1405 North Northwest Loop 323). |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Tyler |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Consumer Products, Residential, Road, Manufacturing (Industrial) |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
