logo
ProjectDelayed

Mixed Use Development

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Proposed development of a multi-block, mixed-use development between NE 12th Ave to the west, NE 14th Avenue to the east, a half-block north of NE Davis street and NE couch st to the south. Residential development with up to 704 dwelling units as well as ground floor retail and at grade and below grade parking for up to 599 parking spaces. 820,354 GSF multi-block mixed-use development with 604,086

Status
Failure
Sector
Consumer Products, Road, Residential, Car parking, Commercial, Automotive
Location
Portland, Oregon, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Mixed Use Development

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Mixed Use Development” is an infrastructure initiative in the Consumer Products sector, located in Portland, Oregon, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Delayed

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Proposed development of a multi-block, mixed-use development between NE 12th Ave to the west, NE 14th Avenue to the east, a half-block north of NE Davis street and NE couch st to the south. Residential development with up to 704 dwelling units as well as ground floor retail and at grade and below grade parking for up to 599 parking spaces. 820,354 GSF multi-block mixed-use development with 604,086 GSF residential, 30,917 GSF retail, 10,000 GSF adaptive re-use & 165,097 GSF parking. 486 parkin...

Budget

Location

Country

United States of America (USA)

State

Oregon

City

Portland

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Consumer Products, Road, Residential, Car parking, Commercial, Automotive

Article published date

2024-10-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project