Mixed-Use Development
Sector: Car parking • Location: Chicago, Illinois, United States of America
Source: Dodge USA
Demolish an existing building to make way for new mixed-use development - 750 square feet of retail space on ground floor - Nine spaces for bikes and four car parking spaces - 9 residential units with 3 studio lofts and 6 three bedroom units-
- Status
- Prospective
- Sector
- Car parking, Residential, Automotive, Manufacturing (Industrial), Commercial
- Location
- Chicago, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Mixed-Use Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Demolish an existing building to make way for new mixed-use development - 750 square feet of retail space on ground floor - Nine spaces for bikes and four car parking spaces - 9 residential units with 3 studio lofts and 6 three bedroom units- |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Chicago |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Residential, Automotive, Manufacturing (Industrial), Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
