Mixed-Use Development
Sector: Manufacturing (Industrial) • Location: Sewickley, Pennsylvania, United States of America
Source: Dodge
A three-story mixed-use development on the site of a former funeral home, including retail space, engineering offices, and condominiums. The project involves 3,000 sq ft for two retail spots on the first floor, office space, and three 2,500 sq ft condos on the third floor. It also includes parking spaces and garages.
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Commercial, Residential, Car parking, Automotive
- Location
- Sewickley, Pennsylvania, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Mixed-Use Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | A three-story mixed-use development on the site of a former funeral home, including retail space, engineering offices, and condominiums. The project involves 3,000 sq ft for two retail spots on the first floor, office space, and three 2,500 sq ft condos on the third floor. It also includes parking spaces and garages. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Sewickley |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Residential, Car parking, Automotive |
Article published date | 2025-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
