logo
ProjectPlanned

MKT Trail Bridge 9 Replacement

One of 10,000+ projects Taiyo tracks in Missouri.

Source: KOMU 8

Columbia Parks and Recreation is planning to replace Bridge 9 on the MKT Trail with a new 105-foot structure designed to support heavier vehicle access.

Status
Prospective
Sector
Bridge
Location
Columbia, Missouri, United States of America
Updated
22 Jul 2026
Source
KOMU 8

ConstructChat

Ask ConstructChat about MKT Trail Bridge 9 Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “MKT Trail Bridge 9 Replacement” is an infrastructure initiative in the Bridge sector, located in Columbia, Missouri, United States. Taiyo aggregates data on it from KOMU 8.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Columbia Parks and Recreation is planning to replace Bridge 9 on the MKT Trail with a new 105-foot structure designed to support heavier vehicle access.

Original sector

Built Sector

Location

Country

United States of America (USA)

State

Missouri

City

Columbia

Source

Source

KOMU 8

URL

More Details

Record type

Project

Sector

Bridge

Article published date

2026-05-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project