Mkuju River Uranium Processing Facility
Sector: Road • Location: Tanzania
Source: Windhoek Observer
Mantra Tanzania Ltd, a subsidiary of Uranium One Group under Rosatom, has commissioned a pilot uranium processing facility at the Mkuju River project in southern Tanzania. The pilot facility at the Nyota deposit will test uranium processing technologies and develop optimization solutions. The main processing facility, planned to produce up to 3000 tons of uranium annually, is scheduled for constru
- Status
- Prospective
- Sector
- Road, Nuclear, Government
- Location
- Tanzania
- Updated
- 22 Jul 2026
- Source
- Windhoek Observer
ConstructChat
Ask ConstructChat about Mkuju River Uranium Processing Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Mantra Tanzania Ltd, a subsidiary of Uranium One Group under Rosatom, has commissioned a pilot uranium processing facility at the Mkuju River project in southern Tanzania. The pilot facility at the Nyota deposit will test uranium processing technologies and develop optimization solutions. The main processing facility, planned to produce up to 3000 tons of uranium annually, is scheduled for construction start in Q1 2026 and operations commencement in 2029. The project aims to create around 4000 jobs and improve regional infrastructure including road upgrades in the Namtumbo district. |
Original sector | Energy |
Location
Country | Tanzania |
Source
Source | Windhoek Observer |
URL |
More Details
Record type | Project |
Sector | Road, Nuclear, Government |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Tanzania
- Open for FDI through a minority stake/Development of a new project/Processing and preserving of fish and fish products/BLUE PROCESSING COMPANY .LTD
- Open for FDI through a minority stake/Purchase of new machinery and equipment/Manufacture of made-up textile articles, except apparel/GSM FOAM CO LTD
- Open for FDI through a minority stake/Establishment of an additional production facility/Manufacture of plastics products/Jafnob Printing and Packaging Ltd
- Open for FDI through a minority stake/Purchase of new machinery and equipment/Manufacture of basic iron and steel/Quaim Steel Mills Ltd
- Open for FDI through a minority stake/Establishment of an additional production facility/Manufacture of articles of concrete, cement and plaster/Lake Group (Premix)
- Open for FDI through a majority stake/Purchase of new machinery and equipment/Manufacture of machinery for food, beverage and tobacco processing/Tall Welding & Fabrications
- Dar es Salaam Water Distribution
- Tanzania Railways
