MLK & Cedar Street Water Main Replacement
Sector: Car parking • Location: Safety Harbor, Florida, United States of America
Source: Dodge USA
Construct new water main and replace 3,450 feet of old galvanized and cast-iron water main. These water main lines will be upgraded to C900 PVC which will last much longer and provide greater water quality. This project will place the 4-inch water main that currently extends through lots 15 and 17 on Fernbrook and runs through the park to residences on MLK St. The new water service lines will come
- Status
- Prospective
- Sector
- Car parking, Road, Metal, Water Supply and Storage, Automotive, Government, Steel, Commercial, Waste Processing and Treatment, Seaport
- Location
- Safety Harbor, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about MLK & Cedar Street Water Main Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construct new water main and replace 3,450 feet of old galvanized and cast-iron water main. These water main lines will be upgraded to C900 PVC which will last much longer and provide greater water quality. This project will place the 4-inch water main that currently extends through lots 15 and 17 on Fernbrook and runs through the park to residences on MLK St. The new water service lines will come from a 6-inch water main on MLK St. UTW005 048-4035-500.63-00 MLK, Cedar St. Water Main Replacement |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Safety Harbor |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Metal, Water Supply and Storage, Automotive, Government, Steel, Commercial, Waste Processing and Treatment, Seaport |
Article published date | 2024-08-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
