Mmadinare solar complex (60MW), phase 2
Sector: Solar • Location: Botswana
Source: World Bank Group
The project comprises the second phase of the 120 MW Mmadinare Solar Complex, Botswana, with a capacity of 60MW.The plant will be located near Mmadinare, close to the former mining town of Selebi-Phikwe, 400 kilometres Northeast of the capital Gaborone. The sponsor, Scatec ASA, has reached financial close on 19 December 2024 is preparing for construction start. The cost of the second phase of the
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project comprises the second phase of the 120 MW Mmadinare Solar Complex, Botswana, with a capacity of 60MW.The plant will be located near Mmadinare, close to the former mining town of Selebi-Phikwe, 400 kilometres Northeast of the capital Gaborone. The sponsor, Scatec ASA, has reached financial close on 19 December 2024 is preparing for construction start. The cost of the second phase of the project is estimated at $58m, as $46.6m are secured as debt funding and the remaining $11.4 are covered by equity. The International Finance Corporation (IFC) provided an A loan of up to $19m, a USD interest rate swap intermediated by IFC and a Parallel loan of up to $27.6m (BWP 380 million) from the South African bank Rand Merchant Bank. In August 2022, Scatec, signed a binding 25-year power purchase agreement (PPA) with Botswana Power Corporation (BPC) for a 60 MW solar PV facility in the Mmadinare District. In the third quarter 2023, Scatec was awarded a 60 MW expansion of the project, taking the total capacity to 120 MW. Scatec owns 100% of the project and will be the designated EPC company, as well as asset manager (AM) and operations and maintenance (O&M) service provider. Construction and operation of the power plants will be managed by Scatec’s organisation in South Africa. The solar power plant will ensure that approximately 48,000 tons of CO2 emissions will be avoided and can power approximately 20,000 households annually. https://scatec.com/2024/12/19/scatec-reaches-financial-close-in-botswana-and-prepares-for-construction-start/ https://scatec.com/2024/12/19/scatec-reaches-financial-close-in-botswana-and-prepares-for-construction-start/ |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Solar projects in Botswana
- Botswana - The Pandamatenga Agricultural Infrastructure Development Project
- Botswana - Feasibility Study for a 200 Megawatts Concentrating Solar Power Plant
- Botswana - Feasibility Study for a 200 Megawatts Concentrating Solar Power Plant
- Botswana - The Pandamatenga Agricultural Infrastructure Development Project
- Botswana - The Pandamatenga Agricultural Infrastructure Development Project
- Botswana Solar
- Botswana Solar Phase 2
- Gaborone Smart City Master Plan
