MMHI Water Utility Improvements
Sector: Commercial • Location: Madison, Wisconsin, United States of America
Source: Dodge USA
The project will construct a water treatment plant and make water infrastructure improvements at Mendota Mental Health Institute (MMHI). The new treatment building will include filtration, chemical storage, and chemical dosing systems. The treatment plant will be integrated into the existing well and distribution system. A new pumping station will move water from the wells to an existing water tow
- Status
- Prospective
- Sector
- Commercial, Water Supply and Storage, Chemical (Industrial), Power Transmission, Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Madison, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about MMHI Water Utility Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will construct a water treatment plant and make water infrastructure improvements at Mendota Mental Health Institute (MMHI). The new treatment building will include filtration, chemical storage, and chemical dosing systems. The treatment plant will be integrated into the existing well and distribution system. A new pumping station will move water from the wells to an existing water tower and reservoir. These storage areas will be improved to enhance reliability and comply with cur... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Madison |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Chemical (Industrial), Power Transmission, Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
