logo
ProjectComplete

MMK STRUCTURED PRE-EXPORT FINANCING FACILITY

Sector: Manufacturing (Industrial) • Location: Russia

Source: European Bank for Reconstruction and Development (EBRD)

Two year roll-over facility for AO Magnitogorsk (MMK) iron and steel works, Magnitogorsk, Chelyabinsk region. The facility has been designed primarily to allow the company to substitute barter and tolling arrangements for cash payments, and to procure major raw materials, energy and transport. The overall effect will be a reduction in the price of the raw materials, alongside an increase in the ex

Status
Closed
Sector
Manufacturing (Industrial), Metal, Steel, Water Supply and Storage, Commercial, Residential
Location
Russia
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about MMK STRUCTURED PRE-EXPORT FINANCING FACILITY

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “MMK STRUCTURED PRE-EXPORT FINANCING FACILITY” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Russia. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Not available for this record.

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Two year roll-over facility for AO Magnitogorsk (MMK) iron and steel works, Magnitogorsk, Chelyabinsk region. The facility has been designed primarily to allow the company to substitute barter and tolling arrangements for cash payments, and to procure major raw materials, energy and transport. The overall effect will be a reduction in the price of the raw materials, alongside an increase in the export prices. In addition to the "anti-barter" effect, the project will be supplemented by a two-year management support programme, including immediate environmental improvements, introduction of a management information system and total quality control. AO Magnitogorsk iron and steel works produces steel products which account for 16 per cent of the total Russian metal output. US$ 100 million asset-backed pre-export financing facility, to be drawn down in tranches and to be rolled over for a maximum of two years. The EBRD's portion will be US$ 35 million; the remainder is to be syndicated to commercial banks. US$ 100 million (ECU 87 million). The project has been screened in category C/1, requiring an environmental audit. No large-scale investment is associated with this specific financing operation. An environmental audit and baseline assessment has been conducted. Currently, MMK has severe compliance problems, the result of developments over the past sixty years being driven by production capacity. The main areas of non-compliance are: fugitive dust emissions; emissions of SO2, NOX, particulates and volatile organic compounds; noise and vibration; concentrations of greases, oils and phosphates and low pH level in effluent waste water; slag and other waste-disposal issues; and environmental and occupational health and safety concerns. Specific energy and raw material use is much higher than that of a typical OECD steel plant. A strategic analysis of MMK was prepared for the Bank by consultants in July 1996. This provides a list of priority environmental investments. The company and its consultants have reviewed and commented on this programme, and an Environmental Action Plan (EAP) has been prepared. The capital expenditure in the first two years related to the implementation of this plan will be financed by MMK itself. MMK will, in parallel, implement a medium-term "management support programme". The company will gradually reach full compliance through the implementation of the EAP. MMK management is both aware of and committed to the implementation of the EAP. In 1997 the EAP requires the completion of a coke gas scrubbing and by-product manufacturing plant (US$ 40 million) and the installation of a secondary gas cleaning facility and improvements to the transport system in the oxygen converter shop (US$ 2 million). None

Original sector

Manufacturing and Services

Location

Country

Russia

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Metal, Steel, Water Supply and Storage, Commercial, Residential

Article published date

2026-06-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project