MN/DOT: Highway 4 (Sherburn to St. James) Improvements
Sector: Water Supply and Storage • Location: Sherburn, Minnesota, United States of America
Source: Dodge USA
The Hwy 4 project between Sherburn and St. James includes roadway, bridge, and drainage improvements. In addition to resurfacing approximately 25 miles of roadway, the bridge over Cedar Run will be replaced and multiple bridges will be repaired. Pedestrian accommodations in the Cities of Sherburn and Trimont will also be improved. Summary of work Resurface roadway Rehabilitate, repair, and replace
- Status
- Closed
- Sector
- Water Supply and Storage, Bridge, Road, Waste Processing and Treatment, Commercial, Manufacturing (Industrial)
- Location
- Sherburn, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about MN/DOT: Highway 4 (Sherburn to St. James) Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Hwy 4 project between Sherburn and St. James includes roadway, bridge, and drainage improvements. In addition to resurfacing approximately 25 miles of roadway, the bridge over Cedar Run will be replaced and multiple bridges will be repaired. Pedestrian accommodations in the Cities of Sherburn and Trimont will also be improved. Summary of work Resurface roadway Rehabilitate, repair, and replace various bridges throughout the project area Replace bridge over Cedar Run Repair the bridges ove... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Sherburn |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Road, Waste Processing and Treatment, Commercial, Manufacturing (Industrial) |
Article published date | 2024-03-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
