MN/DOT: Highway 51/Snelling Avenue Improvements
Sector: Car parking • Location: Saint Paul, Minnesota, United States of America
Source: Dodge USA
Crews will reconfigure Hwy 51/Snelling Ave. between Montreal Ave. and Ford Pkwy. in St. Paul in 2024. This traffic safety project will construct a center median, reconstruct the traffic signal at Montreal Ave. and Snelling Ave., reduce traffic to one lane in each direction with dedicated left turns at the median breaks, remove parking along Snelling Ave., and construct a new 10 multi-use trail on
- Status
- Prospective
- Sector
- Car parking, Water Supply and Storage, Waste Processing and Treatment, Road, Automotive, Commercial
- Location
- Saint Paul, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about MN/DOT: Highway 51/Snelling Avenue Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Crews will reconfigure Hwy 51/Snelling Ave. between Montreal Ave. and Ford Pkwy. in St. Paul in 2024. This traffic safety project will construct a center median, reconstruct the traffic signal at Montreal Ave. and Snelling Ave., reduce traffic to one lane in each direction with dedicated left turns at the median breaks, remove parking along Snelling Ave., and construct a new 10 multi-use trail on the east side of Snelling Ave.. Summary of work Construct center median along Snelling Ave., with... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Saint Paul |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Water Supply and Storage, Waste Processing and Treatment, Road, Automotive, Commercial |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
