MN/DOT: Highway 51/Snelling Avenue Improvements
Sector: Water Supply and Storage • Location: Saint Paul, Minnesota, United States of America
Source: Dodge
Crews will reconfigure Hwy 51/Snelling Ave. between Montreal Ave. and Ford Pkwy. in St. Paul in 2024. This traffic safety project will construct a center median, reconstruct the traffic signal at Montreal Ave. and Snelling Ave., reduce traffic to one lane in each direction with dedicated left turns at the median breaks, remove parking along Snelling Ave., and construct a new 10 multi-use trail on
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Commercial, Car parking, Waste Processing and Treatment, Automotive
- Location
- Saint Paul, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about MN/DOT: Highway 51/Snelling Avenue Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Crews will reconfigure Hwy 51/Snelling Ave. between Montreal Ave. and Ford Pkwy. in St. Paul in 2024. This traffic safety project will construct a center median, reconstruct the traffic signal at Montreal Ave. and Snelling Ave., reduce traffic to one lane in each direction with dedicated left turns at the median breaks, remove parking along Snelling Ave., and construct a new 10 multi-use trail on the east side of Snelling Ave.. Summary of work Construct center median along Snelling Ave., with... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Saint Paul |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Commercial, Car parking, Waste Processing and Treatment, Automotive |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
