MN/DOT: Highway 55 Improvements
Sector: Water Supply and Storage • Location: Minneapolis, Minnesota, United States of America
Source: Dodge
Crews will resurface Hwy 55 between Old Rockford Rd. in Plymouth and General Mills Blvd. in Golden Valley. Summary of work Resurface Hwy 55 Improve safety with access closures and modifications Accessibility improvements Improve drainage Signal replacement at Vicksburg Ln. with a mast arm which eliminates median signals
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Commercial, Waste Processing and Treatment, Manufacturing (Industrial)
- Location
- Minneapolis, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about MN/DOT: Highway 55 Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Crews will resurface Hwy 55 between Old Rockford Rd. in Plymouth and General Mills Blvd. in Golden Valley. Summary of work Resurface Hwy 55 Improve safety with access closures and modifications Accessibility improvements Improve drainage Signal replacement at Vicksburg Ln. with a mast arm which eliminates median signals |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Minneapolis |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Commercial, Waste Processing and Treatment, Manufacturing (Industrial) |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
