MN/DOT: TH 59 Reconstruction
One of 10,000+ projects Taiyo tracks in Minnesota.
Source: Dodge
Development of construction limits, production of a biddable final design plan set and special provisions, and post-letting assistance on State Project (SP) 5304-41, Trunk Highway (TH) 59 from 27th Street North to TH 60 in Worthington. This project is approximately 1.8 miles in length. Major construction items include grading, concrete surfacing, lighting, and drainage. The State of Minnesota, Dep
- Status
- Closed
- Sector
- Waste Processing and Treatment, Car parking, Road, Water Supply and Storage, Automotive, Commercial, Cement
- Location
- Worthington, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about MN/DOT: TH 59 Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Development of construction limits, production of a biddable final design plan set and special provisions, and post-letting assistance on State Project (SP) 5304-41, Trunk Highway (TH) 59 from 27th Street North to TH 60 in Worthington. This project is approximately 1.8 miles in length. Major construction items include grading, concrete surfacing, lighting, and drainage. The State of Minnesota, Department of Transportation, may be seeking a consultant to provide design services for a reconstru... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Worthington |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Car parking, Road, Water Supply and Storage, Automotive, Commercial, Cement |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
