logo

Moapa Southern Paiute Solar Project

Sector: Automotive • Location: Nevada, United States of America

Source: Federal Highway Administration (FHWA)

Project
Close

The Moapa Southern Paiute Solar Project is a 250-megawatt (MW) alternative current solar array located on roughly 2,000 acres of the Moapa River Indian Reservation in Clark County, Nevada. The project is the first large-scale solar project to receive construction approval on a tribal land in North America. It was constructed and is operated by First Solar, who began the project in 2014 after

Project Information FAQ

Project Information

5 Q
The project “Moapa Southern Paiute Solar Project” is an infrastructure initiative in the Automotive sector, located in Nevada, United States of America. Taiyo aggregates data on it from Federal Highway Administration (FHWA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Moapa Southern Paiute Solar Project is a 250-megawatt (MW) alternative current solar array located on roughly 2,000 acres of the Moapa River Indian Reservation in Clark County, Nevada. The project is the first large-scale solar project to receive construction approval on a tribal land in North America. It was constructed and is operated by First Solar, who began the project in 2014 after acquiring it from K Road Power Holdings, LLC. The project, which became operational in 2017, provided 115 jobs to tribal and other Native Americans during construction. The solar array uses 3.2 million advanced photovoltaic thin firm solar modules, which translates to more than 25 million square footage worth of solar panels. It generates enough solar energy to serve approximately 111,000 homes, removing about 341,000 metric tons of carbon dioxide annually or the equivalent to eliminating 73,000 cars from the roads. An on-site substation and 5.5-mile, 500 kilovolt transmission line connect the solar arrays to the existing Crystal Substation that serves energy users in California. The Moapa Southern Paiute Solar Project has a Power Purchase Agreement with the Los Angeles Department of Water and Power to deliver clean solar energy for 25 years. It will generate millions of dollars in income for the Tribe, increase State and local tax revenues, plus create benefits for many local businesses. The project is also expected to help the City of Los Angeles achieve 50 percent of all energy from renewable resources by 2025. The project successfully obtained the following Federal actions: The Bureau of Indian Affairs (BIA) approved a solar energy ground lease and associated agreements between Moapa Solar LLC and the Moapa Band of Paiute Indians (Tribe), including associated rights-of-ways (ROWs) and easements for ancillary facilities on tribal land and The Bureau of Land Management (BLM) approved ROWs for an access road and transmission lines on BLM-managed lands as well as portions of a water pipeline and transmission lines within a BLM-managed utility corridor within the Reservation.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data