Moapa Southern Paiute Solar Project
Sector: Automotive • Location: Nevada, United States of America
Source: Federal Highway Administration (FHWA)
The Moapa Southern Paiute Solar Project is a 250-megawatt (MW) alternative current solar array located on roughly 2,000 acres of the Moapa River Indian Reservation in Clark County, Nevada. The project is the first large-scale solar project to receive construction approval on a tribal land in North America. It was constructed and is operated by First Solar, who began the project in 2014 after
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Close |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Moapa Southern Paiute Solar Project is a 250-megawatt (MW) alternative current solar array located on roughly 2,000 acres of the Moapa River Indian Reservation in Clark County, Nevada. The project is the first large-scale solar project to receive construction approval on a tribal land in North America. It was constructed and is operated by First Solar, who began the project in 2014 after acquiring it from K Road Power Holdings, LLC. The project, which became operational in 2017, provided 115 jobs to tribal and other Native Americans during construction. The solar array uses 3.2 million advanced photovoltaic thin firm solar modules, which translates to more than 25 million square footage worth of solar panels. It generates enough solar energy to serve approximately 111,000 homes, removing about 341,000 metric tons of carbon dioxide annually or the equivalent to eliminating 73,000 cars from the roads. An on-site substation and 5.5-mile, 500 kilovolt transmission line connect the solar arrays to the existing Crystal Substation that serves energy users in California. The Moapa Southern Paiute Solar Project has a Power Purchase Agreement with the Los Angeles Department of Water and Power to deliver clean solar energy for 25 years. It will generate millions of dollars in income for the Tribe, increase State and local tax revenues, plus create benefits for many local businesses. The project is also expected to help the City of Los Angeles achieve 50 percent of all energy from renewable resources by 2025. The project successfully obtained the following Federal actions: The Bureau of Indian Affairs (BIA) approved a solar energy ground lease and associated agreements between Moapa Solar LLC and the Moapa Band of Paiute Indians (Tribe), including associated rights-of-ways (ROWs) and easements for ancillary facilities on tribal land and The Bureau of Land Management (BLM) approved ROWs for an access road and transmission lines on BLM-managed lands as well as portions of a water pipeline and transmission lines within a BLM-managed utility corridor within the Reservation. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
