Mobile National Cemetery Grounds Maintenance IDIQ
Sector: Commercial • Location: Mobile, Alabama, United States of America
Source: Dodge USA
Work consists of the Contractor ensuring that roadways are clear and the collection and removal of debris from high visibility and common areas throughout the cemetery grounds due to damage resulting from an extreme weather event. Minor storm damage to include, but not limited to, clearing/removal of fallen limbs and/or collection of natural debris associated with typical Central Alabama afternoon
- Status
- Closed
- Sector
- Commercial, Manufacturing (Industrial)
- Location
- Mobile, Alabama, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Mobile National Cemetery Grounds Maintenance IDIQ
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work consists of the Contractor ensuring that roadways are clear and the collection and removal of debris from high visibility and common areas throughout the cemetery grounds due to damage resulting from an extreme weather event. Minor storm damage to include, but not limited to, clearing/removal of fallen limbs and/or collection of natural debris associated with typical Central Alabama afternoon thunderstorms is included in prior statements of work and for purposes of compensation shall not... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alabama |
City | Mobile |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Manufacturing (Industrial) |
Article published date | 2024-06-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
