Mobility Hub Replacement
Pre-design · Florida · Last reported Sep 2025
Source: Dodge
Design and construction of a replacement for a 282 space 1960's era parking garage with a new state of the art 750 space parking and mobility hub. The new facility will contain parking, ground floor retail, EV chargining infrastructure, ride/vehicle sharing services, micro-mobility facilities, an activated paseo/public space ecommerce ammenities and transit connections
- Status
- Prospective
- Sector
- Electric Vehicles (EVs), Power Generation (CCGT), Automotive, Government, Manufacturing (Industrial), Car parking, Commercial
- Location
- Coral Gables, Florida, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Mobility Hub Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Design and construction of a replacement for a 282 space 1960's era parking garage with a new state of the art 750 space parking and mobility hub. The new facility will contain parking, ground floor retail, EV chargining infrastructure, ride/vehicle sharing services, micro-mobility facilities, an activated paseo/public space ecommerce ammenities and transit connections |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Coral Gables |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Electric Vehicles (EVs), Power Generation (CCGT), Automotive, Government, Manufacturing (Industrial), Car parking, Commercial |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Electric Vehicles (EVs) projects in United States of America
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 20 MDOULES 8 KW INSTALL EV CHARGER
- QLINE Streetcar Overhead Catenary System
- Metropolitan Park
- Sierra Regency Roof Eve Extensions
- 466135 CLOUD PL NE Local Roadway Paving Restoration
- 378944 Alley-47076042 Citywide Alley Restoration
- Community Food Projects Competitive Grant Program
- Hydrogen Delivery Technologies
