Mocuba Solar

Sector: Steel • Location: Mozambique

Source: International Finance Corporation (IFC)

Project
Active

Central Solar de Mocuba (the “project” or “the company”) consists of the design, construction and operation of a 40MW solar photovoltaic (PV) power plant in Mocuba, in the Zambézia Province in Central Mozambique. The total project cost is estimated at US$84m. IFC’s proposed investment consists of an A loan of up to US$21 million and a B Loan of up to US$21.2 million from the Emerging Africa Inve

Project Information FAQ

Project Information

4 Q
The project “Mocuba Solar” is an infrastructure initiative in the Steel sector, located in Mozambique. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Central Solar de Mocuba (the “project” or “the company”) consists of the design, construction and operation of a 40MW solar photovoltaic (PV) power plant in Mocuba, in the Zambézia Province in Central Mozambique. The total project cost is estimated at US$84m. IFC’s proposed investment consists of an A loan of up to US$21 million and a B Loan of up to US$21.2 million from the Emerging Africa Investment Fund. The project sponsors are – Scatec Solar (52.5%), a Norwegian solar power company; Norfund (22.5%), the Norwegian Investment Fund for Developing Countries; and Electricidade de Mozambique (EDM, 25%), Mozambique''s state-owned public power utility. The project will be financed through a special purpose vehicle (SPV) created for the project and IFC’s funds will be routed through this SPV. The project will sell 100% of its output to EDM under a 25-year power purchase agreement.The power plant will be built on a 126-hectare (ha) plot near the existing EDM substation in Mocuba, 13 km from the center of the city of Mocuba, in the Zambezia Province, Mozambique. The proposed site is located in the Special Economic Zone of Mocuba (Zona Económica Especial de Mocuba). The District of Mocuba is characterized by slightly undulating rolling hills with rocky summits and Mocuba is part of the erosion plain of Zambezia. The project area is located on a relatively flat area and is mostly underlain by rocks. The project site is located within the Licungo River basin; the nearest point from the project perimeter is about 2.5 km from the eastern bank of the Licungo River. The Egaro River is closer to the project area and is located directly adjacent to the site towards the east.The project site was previously used for subsistence farming and the surrounding land use includes a mixture of agricultural land and uncultivated land. The project will include a 500-1000m 33kV transmission line to the Mocuba substation and the construction of a 500-1000m gravel road to connect the project site to the main road (R479). The solar power plant will compose of panels of polycrystalline PV modules, suitable for 1,500V PV system applications. It is expected that there will be 32 modules per string; each PV module’s power rating will be 320Wp and the number of strings will be 3952 (equaling a total number of modules of 126,464). The PV modules will be mounted using a steel substructure embedded in the ground. The total amount of AC installed power will be 30MW and total DC power will be approximately 40MW. The plant will occupy approximately 70 ha of the 126 ha site.Central Solar de Mocuba (CESOM) has assigned Scatec Solar as the engineering, procurement and construction (EPC) contractor as well as the operations and maintenance (O&M) contractor. As at the time of IFC’s visit in November 2015, construction had not started but de-mining operations and geotechnical surveys were being carried out. The construction phase is expected to take nine months; commissioning is expected to be in December 2016 with plant take-over expected in February 2017.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data