Mod 1 Subbase Preparation Construction Phase Ix
Sector: Manufacturing (Industrial) • Location: La Crosse, Wisconsin, United States of America
Source: Dodge
Major components of the Work include: Clearing and grubbing and stripping and salvaging topsoils. Investigation and excavation of sandstone bedrock to two feet below future proposed clay liner subbase elevations. Excavation and backfilling and compacting overburden soils at the Phase IX Module 1 to project elevations and density requirements. Completion of Phase IX areas to clay liner subbase elev
- Status
- Closed
- Sector
- Manufacturing (Industrial), Commercial, Government
- Location
- La Crosse, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Mod 1 Subbase Preparation Construction Phase Ix
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Major components of the Work include: Clearing and grubbing and stripping and salvaging topsoils. Investigation and excavation of sandstone bedrock to two feet below future proposed clay liner subbase elevations. Excavation and backfilling and compacting overburden soils at the Phase IX Module 1 to project elevations and density requirements. Completion of Phase IX areas to clay liner subbase elevations as indicated on plans. Hauling and stockpiling excess soils. Site access roadway construct... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | La Crosse |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Government |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
