Modernisation of railway line Žilina - Košice, section Spišská Nová Ves - Spišské Tomášovce
The status, timeline and source of this project. A free account opens every field.
Source: EU Funding & Tenders Portal
The project addresses the upgrade of a 4.9 km double-track railway section between Spišská Nová Ves and Spišské Tomášovce, part of the railway line Žilina - Košice - Čierna nad Tisou - SK/UA, situated on the Rhine – Danube European Transport Corridor. It includes the reconstruction of the safety and security infrastructure at the railway station Poprad-Tatry. The project is part of the Global Proj
- Status
- Under Construction
- Sector
- Mass Transit, Commercial, Rail, Road, Government
- Location
- Slovakia
- Updated
- 22 Jul 2026
- Source
- EU Funding & Tenders Portal
ConstructChat
Ask ConstructChat about Modernisation of railway line Žilina - Košice, section Spišská Nová Ves - Spišské Tomášovce
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | ongoing |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project addresses the upgrade of a 4.9 km double-track railway section between Spišská Nová Ves and Spišské Tomášovce, part of the railway line Žilina - Košice - Čierna nad Tisou - SK/UA, situated on the Rhine – Danube European Transport Corridor. It includes the reconstruction of the safety and security infrastructure at the railway station Poprad-Tatry. The project is part of the Global Project “Modernization of the railway line Žilina - Košice - Čierna nad Tisou - SK/UA”, which aims to increase the capacity, safety and travel speed of the railway line, enhancing regional connectivity and economic development, as well as the attractiveness of rail transport. The technical parameters of the new railway section will be in compliance with the relevant standards for the rail Core Network. These include in particular: - maximum speed up to 160 km/h - UIC GC clearance - axle load of 22.5 t/axle (Cat. UIC D4) - electrification (3 kV DC system, with the possibility of later rearrangement to the 25 kV AC system) - running of 750 m long trains The project covers the following main construction works: - upgrade of the substructure and superstructure along the 4.9 km railway section Spišská Nová Ves (outside) – switching station Spišské Tomášovce, including necessary changes to alignment, - installation of new overhead catenary and energy supply equipment, - removal of level crossings, construction of new railway bridges, retaining walls and noise barriers, - upgrade of the switching Station Spišské Tomášovce, - upgrade of Smižany stop, including underpasses, - reconstruction of the affected road infrastructure, including 2 new roundabouts, - reconstruction of existing Poprad – Tatry railway station building in order to adapt it to host the future Traffic Management Centre Poprad. |
Location
Country | Slovakia |
Source
Source | EU Funding & Tenders Portal |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Commercial, Rail, Road, Government |
Article published date | 2026-02-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Mass Transit projects in Slovakia
- BRATISLAVA SUSTAINABLE URBAN MOBILITY
- PRESOV URBAN DEVELOPMENT
- SLOVAKIAN RAILWAYS MODERNISATION
- Railway Track Trencianska Tepla-Belusa
- Vybudovanie infraštruktúry na kontrolu a prípravu vozového parku železničnej osobnej dopravy
- Modernisation of Tram track in Košice, Stage 2, Part 1
- ŽSR, Transport Node Bratislava
- Modern Of Railway Track - Sect Belusa-Puchov
