logo

Modernization of hydro pumped storage of Čierný Váh

Sector: Hydro • Location: Slovakia

Source: EU Funding & Tenders Portal

Project
Ongoing

The project contributes to the implementation of the PCI 2.11 Modernisation of Pumped Hydroelectric Energy Storage in Čierny Váh (SK) [currently referred to as “SE Integrator”], which consists of an upgrade of the existing pumped hydro energy storage Čierny Váh along with a hybridization of the pumped storage plant by integrating new battery storage technology (up to 80 MW, 160 MWh). It includes t

Project Information FAQ

Project Information

3 Q
The project “Modernization of hydro pumped storage of Čierný Váh” is an infrastructure initiative in the Hydro sector, located in Slovakia. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project contributes to the implementation of the PCI 2.11 Modernisation of Pumped Hydroelectric Energy Storage in Čierny Váh (SK) [currently referred to as “SE Integrator”], which consists of an upgrade of the existing pumped hydro energy storage Čierny Váh along with a hybridization of the pumped storage plant by integrating new battery storage technology (up to 80 MW, 160 MWh). It includes the modernisation of two out of the six existing units for improved operational efficiency. The project’s objectives are to conduct studies and outline the technical specifications to modernize the power plant to variable speed and prepare for the large-scale battery storage and define a hybridization system to optimize the integration of the associated technologies. The project’s scope covers technical and financial feasibility studies, including inter alia market simulations, financial gap calculation, civil engineering, hydro, electro, battery energy storage system (BESS), hybridization and power-plant’s control systems, as well as the development of overall technical specifications for system integration. The project will be carried out by internal and external resources. The main deliverables are: • Final business plan completed; • Civil engineering studies completed; • Variable speed solution for turbines and pumps completed; • Electro studies completed; • Grid study for frequency converters and BESS completed; • Technical review on hybrid control system and interfaces evaluation completed; • Overall solution for system integration defined. Upon completion of this project, the PCI will be ready to enter the Final Investment Decision (FID) phase.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data