logo

Modernization of the Praha-Bubny – Praha-Výstaviště railway line

Sector: Rail • Location: Czechia

Source: EU Funding & Tenders Portal

Project
Ongoing

The project aims to upgrade the railway infrastructure of the Praha-Bubny Railway Station and the connecting railway section to the new Railway Stop Praha-Výstaviště as part of the connection Prague – Václav Havel Airport and further to Kladno, the largest city of the Central Bohemia region. The project is located on the Orient/East- Med corridor. It is part of the Global Project addressing the re

Project Information FAQ

Project Information

4 Q
The project “Modernization of the Praha-Bubny – Praha-Výstaviště railway line” is an infrastructure initiative in the Rail sector, located in Czechia. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project aims to upgrade the railway infrastructure of the Praha-Bubny Railway Station and the connecting railway section to the new Railway Stop Praha-Výstaviště as part of the connection Prague – Václav Havel Airport and further to Kladno, the largest city of the Central Bohemia region. The project is located on the Orient/East- Med corridor. It is part of the Global Project addressing the reconstruction of the Prague Railway Junction. Railway lines in the Prague railway junction run mostly radially and connect Prague with other cities in the Czech Republic and neighbouring countries of the European Union. The railway section for the project consists of two railway lines: the first one (No. 120 Praha - Kladno – Rakovník), on the core network, represents part of the future connection to the airport whereas the second one (No. 090 Praha - Vraňany – Děčín) contributes to the comprehensive network. The objectives of the project are as follows: - improve the technical conditions and parameters of 1.871 km of railway lines (1.410 km on line 120 and 0.461 km on line 90) in the Praha-Bubny - Praha-Výstaviště section, with increase in the capacity (from single to double tracks) and in the maximum line speed (from the current 30-40 km/h to 60-80 km/h), - improve interoperability and safety of operations, with the elimination of level crossings - enhance modal shift, improving public transport-rail links and transport services in the area - shorten travel times - eliminate the negative impact of diesel traction on the environment, through the electrification of the lines. The implementation of the project and achievement of its objectives will result in the completion of another section of the connection to the Václav Havel Airport Prague and to Kladno, improving the traffic and transport services and increasing accessibility and safety.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data