Modernize Short Stay
Sector: Water Supply and Storage • Location: Ann Arbor, Michigan, United States of America
Source: Dodge
The Contractor shall furnish all labor, tools, materials, and equipment to renovate Patient Short Stay Clinic. Work includes, but is not limited to, the following: Renovation of existing patient rooms, specialty procedure rooms, staff areas, storage rooms, and locker rooms. Upgrading physical security systems. Installation of new Air Handler Unit, air terminal unit boxes, ductwork, and diffusers,
- Status
- Closed
- Sector
- Water Supply and Storage, Residential, Commercial, Hospital, Hotel
- Location
- Ann Arbor, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Modernize Short Stay
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Contractor shall furnish all labor, tools, materials, and equipment to renovate Patient Short Stay Clinic. Work includes, but is not limited to, the following: Renovation of existing patient rooms, specialty procedure rooms, staff areas, storage rooms, and locker rooms. Upgrading physical security systems. Installation of new Air Handler Unit, air terminal unit boxes, ductwork, and diffusers, and control valves. Testing, adjusting, and balancing of the entire HVAC, data, and water system,... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Ann Arbor |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Residential, Commercial, Hospital, Hotel |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
