logo

Modification in Existing Plant by Installing Auxiliary Facilities without Increasing Plant Capacity

Sector: Commercial • Location: Surat, Gujarat, India

Source: India Investment Grid (IIG)

Project
Closed

Economic/Social Impact of the Project M/s. ArcelorMittal Nippon Steel India Limited [Formerly Essar Steel India Limited] is planning for Modification in Existing Plant by Installing Auxiliary Facilities without Increasing Plant Capacity located at 27th km, Notified Hazira Industrial Area, Surat Hazira Road, Surat-394270, Gujarat. 1. Coal briquetting Plant [1000 TPD] 2. BF - PCI Project [80 T/H

Project Information FAQ

Project Information

5 Q
The project “Modification in Existing Plant by Installing Auxiliary Facilities without Increasing Plant Capacity” is an infrastructure initiative in the Commercial sector, located in Surat, Gujarat, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Economic/Social Impact of the Project M/s. ArcelorMittal Nippon Steel India Limited [Formerly Essar Steel India Limited] is planning for Modification in Existing Plant by Installing Auxiliary Facilities without Increasing Plant Capacity located at 27th km, Notified Hazira Industrial Area, Surat Hazira Road, Surat-394270, Gujarat. 1. Coal briquetting Plant [1000 TPD] 2. BF - PCI Project [80 T/Hr] 3. Ladle furnace-5 4. Lime Kiln [500 TPD] 5. Rotary Kiln [200 TPD] 6. Additional Ladle Furnace [LF7] 7. Blast Furnace Dust Catcher /Dust separation unit -150 TPD 8. Acid Regeneration Plant-100 KL & Pickling line-3 9. Tank Farm-2 with interconnection between PKL-3 & ARP-2 10. BF slag grinding mill [BOO]- 50 TPD 11. New Cooling towers for Mod-1,2,3,4,5 and 6 12. Mod 4 additional VPSA to utilize Corex gas and going forward Coke oven gas 13. Slag Conditioning & Metal Recovery plant 14. Hot metal Pretreatment Station Outside Shop 15. Thick Plate Normalizing Furnace 16. Shot blasting machine 17. VD Cooling Tower 18. RHD Cooling Tower 19. Water Treatment Plant for 500 MW CCPP 20. SMP-1 Fume Extraction System upgradation 21. CRM-2 and other modifications The project is expected to generate employment for 1770 people [380 Direct and 1390 Indirect]. It is well understood that approximately additional 9000 people will be positively impacted by the project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data