Modification of Hydro-Québec’s facilities in Inukjuak to integrate and optimize the hydroelectricity generated from the Innavik power station
One of 10,000+ projects Taiyo tracks in Quebec.
Source: Infrastructure Canada
The project aims to modify and modernize Hydro-Québec’s facilities in Inukjuak in order to integrate the energy from the Innavik hydroelectric power plant. The scope of the project includes the development of a transformer and switching station to integrate the production of the hydropower plant into the network. Hydro-Québec will also increase the grid’s voltage from 4 to 25 kilovolt (kV) to ac
- Status
- Under Construction
- Sector
- Hydro, Power Generation (CCGT), Government
- Location
- Quebec, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Modification of Hydro-Québec’s facilities in Inukjuak to integrate and optimize the hydroelectricity generated from the Innavik power station
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project aims to modify and modernize Hydro-Québec’s facilities in Inukjuak in order to integrate the energy from the Innavik hydroelectric power plant. The scope of the project includes the development of a transformer and switching station to integrate the production of the hydropower plant into the network. Hydro-Québec will also increase the grid’s voltage from 4 to 25 kilovolt (kV) to accommodate the capacity of the Innavik hydroelectric power plant and to ensure the customers’ heating load is adapted to this new green energy source. The project also includes a telecommunications system to control the customers’ heating supply. Finally, Hydro-Quebec will also build a back-up power plant, which will be less emissive that the current facility and will ensure that the community has access to a reliable source of energy when the Innavik Hydro plant is not available due to the climate in this remote community. Modifying Hydro-Québec’s facilities will result in an increased capacity to manage more renewable energy sources, notably through the integration of hydroelectricity. The construction of a back-up plant will also ensure that this rural and northern community has access to more efficient and reliable energy sources. |
Original sector | Green Energy |
Budget |
Location
Country | Canada |
State | Quebec |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT), Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Canada
- Manitoba Hydro High Voltage Test Facility
- Wuskwatim Generating Station
- Manitoba Hydro Dorsey Converter Station
- Beeton Hydroelectric Development
- Thorold Cogeneration Project Ontario Canada
- Claresholm Solar Project Alberta
- Halton Hills Combined Cycle Plant
- Highway Rehab -- Bridge replacement Power Dam Interchange 786, United Counties of Stormont, Dundas and Glengarry
