Modified Central City, North Bypass Channel
Sector: Water Supply and Storage • Location: Fort Worth, Texas, United States of America
Source: Dodge
Project includes construction of approximately 3,900 feet long and 300 feet wide bypass channel consisting of a floodwall on the east side (right bank) and an earthen levee on the west side (left bank). The project includes a combination of flood risk management, betterment features, pedestrian walkways and bridges, lighting, plaza parks, kayak launches, accessibility with signage, storage areas,
- Status
- Prospective
- Sector
- Water Supply and Storage, Car parking, Automotive, Bridge, Waste Processing and Treatment, Commercial
- Location
- Fort Worth, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Modified Central City, North Bypass Channel
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project includes construction of approximately 3,900 feet long and 300 feet wide bypass channel consisting of a floodwall on the east side (right bank) and an earthen levee on the west side (left bank). The project includes a combination of flood risk management, betterment features, pedestrian walkways and bridges, lighting, plaza parks, kayak launches, accessibility with signage, storage areas, and stormwater infrastructure. Project challenges will require the successful contractor to be ab... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Fort Worth |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Automotive, Bridge, Waste Processing and Treatment, Commercial |
Article published date | 2025-04-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
