Modified Central City Trinity River SOURCES SOUGHT
One of 10,000+ projects Taiyo tracks in Texas.
Source: Dodge
The U.S. Army Corps of Engineers (USACE), Fort Worth District has been tasked to solicit for and award a construction contract to construct a maintenance bridge, located within the existing Fort Worth Floodway on the West Fork (about 500 feet upstream of the historic Fort Worth and Western railroad bridge) and about 900 feet upstream of the FWCC bypass channel/West Fork confluence, in support of t
- Status
- Closed
- Sector
- Commercial, Bridge, Road, Rail
- Location
- Fort Worth, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Modified Central City Trinity River SOURCES SOUGHT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The U.S. Army Corps of Engineers (USACE), Fort Worth District has been tasked to solicit for and award a construction contract to construct a maintenance bridge, located within the existing Fort Worth Floodway on the West Fork (about 500 feet upstream of the historic Fort Worth and Western railroad bridge) and about 900 feet upstream of the FWCC bypass channel/West Fork confluence, in support of the Modified Central City Project. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Fort Worth |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Commercial, Bridge, Road, Rail |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
