logo

MO/DOT: Edina Maintenance Complex Sewer Connection

Sector: Water Supply and Storage • Location: Edina, Missouri, United States of America

Source: Dodge USA

Project
Closed

MoDOT seeks a qualified contractor to install two (2) grinder pumps, FRP lift station and valve vault, valves, flow meter, piping, and appurtenances.

Status
Closed
Sector
Water Supply and Storage, Commercial, Waste Processing and Treatment
Location
Edina, Missouri, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about MO/DOT: Edina Maintenance Complex Sewer Connection

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “MO/DOT: Edina Maintenance Complex Sewer Connection” is an infrastructure initiative in the Water Supply and Storage sector, located in Edina, Missouri, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

MoDOT seeks a qualified contractor to install two (2) grinder pumps, FRP lift station and valve vault, valves, flow meter, piping, and appurtenances.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Missouri

City

Edina

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Waste Processing and Treatment

Article published date

2024-11-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project