logo

MO/DOT: MO 13 Bridge Washing

Sector: Bridge • Location: Kimberling City, Missouri, United States of America

Source: Dodge USA

Project
Design Development

Bridge washing over Table Rock Lake in Kimberling City and on Rte. 39 over Table Rock Lake in Shell Knob. Project involves bridges A0585 and A0260

Status
Prospective
Sector
Bridge, Road, Commercial
Location
Kimberling City, Missouri, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about MO/DOT: MO 13 Bridge Washing

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “MO/DOT: MO 13 Bridge Washing” is an infrastructure initiative in the Bridge sector, located in Kimberling City, Missouri, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Design Development

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Bridge washing over Table Rock Lake in Kimberling City and on Rte. 39 over Table Rock Lake in Shell Knob. Project involves bridges A0585 and A0260

Procurement method

Budget

Location

Country

United States of America (USA)

State

Missouri

City

Kimberling City

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Road, Commercial

Article published date

2024-04-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project