logo
ProjectPlanning Schematics

MO/DOT: MO 291 Bridge Replacement

Sector: Bridge • Location: Lee'S Summit, Missouri, United States of America

Source: Dodge USA

Bridge replacement, rebuild pavement, add sidewalks and realign north ramp of interchange from SE 7th Terrace to SE Oldham Parkway. Project involves bridge A1748. $10,705,407 Cost Share, $6,400,000 MARC STBG-Urban and $11,115,427 Lee's Summit funds

Status
Prospective
Sector
Bridge, Car parking, Road, Automotive, Commercial
Location
Lee'S Summit, Missouri, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about MO/DOT: MO 291 Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “MO/DOT: MO 291 Bridge Replacement” is an infrastructure initiative in the Bridge sector, located in Lee'S Summit, Missouri, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Bridge replacement, rebuild pavement, add sidewalks and realign north ramp of interchange from SE 7th Terrace to SE Oldham Parkway. Project involves bridge A1748. $10,705,407 Cost Share, $6,400,000 MARC STBG-Urban and $11,115,427 Lee's Summit funds

Procurement method

Budget

Location

Country

United States of America (USA)

State

Missouri

City

Lee'S Summit

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Car parking, Road, Automotive, Commercial

Article published date

2024-04-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project