logo

MO/DOT: MO 5 Road Resurface (CO D02)

Sector: Road • Location: Fayette, Missouri, United States of America

Source: Dodge USA

Project
Closed

****(1): Job J5P3517 Route 5, 240, Alt 240 HOWARD County. Resurface on Route 5 from Route 87 to Route 40, on Route 240 from Route 5 to Route 40, and on Route Alt 240 from Route 240 to Route 40, the total length of improvement being 36.967 miles.

Status
Closed
Sector
Road, Commercial
Location
Fayette, Missouri, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about MO/DOT: MO 5 Road Resurface (CO D02)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “MO/DOT: MO 5 Road Resurface (CO D02)” is an infrastructure initiative in the Road sector, located in Fayette, Missouri, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

****(1): Job J5P3517 Route 5, 240, Alt 240 HOWARD County. Resurface on Route 5 from Route 87 to Route 40, on Route 240 from Route 5 to Route 40, and on Route Alt 240 from Route 240 to Route 40, the total length of improvement being 36.967 miles.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Missouri

City

Fayette

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Road, Commercial

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project