logo

MO/DOT: Pavement Resurfacing (CO B02)

Sector: Manufacturing (Industrial) • Location: Moberly, Missouri, United States of America

Source: Dodge USA

Project
Bid Results

RANDOLPH - Resurface from County Road 1650 to Route 24 in Moberly. Resurface from Route C near Huntsville to Route BB. Resurface from Route 3 to Route A near Moberly

Status
Closed
Sector
Manufacturing (Industrial), Commercial, Road
Location
Moberly, Missouri, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about MO/DOT: Pavement Resurfacing (CO B02)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “MO/DOT: Pavement Resurfacing (CO B02)” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Moberly, Missouri, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

RANDOLPH - Resurface from County Road 1650 to Route 24 in Moberly. Resurface from Route C near Huntsville to Route BB. Resurface from Route 3 to Route A near Moberly

Procurement method

Budget

Location

Country

United States of America (USA)

State

Missouri

City

Moberly

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Commercial, Road

Article published date

2024-10-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project