logo

MO/DOT: Resurface From Route 67 to Route 142

Sector: Government • Location: Poplar Bluff, Missouri, United States of America

Source: Dodge USA

Project
Bidding

Job J9S3672 Route 158 BUTLER County. Resurface from Route 67 to Route 142 near Harviell, the total length of improvement being 4.962 miles

Status
Prospective
Sector
Government, Manufacturing (Industrial), Commercial, Road
Location
Poplar Bluff, Missouri, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about MO/DOT: Resurface From Route 67 to Route 142

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “MO/DOT: Resurface From Route 67 to Route 142” is an infrastructure initiative in the Government sector, located in Poplar Bluff, Missouri, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Job J9S3672 Route 158 BUTLER County. Resurface from Route 67 to Route 142 near Harviell, the total length of improvement being 4.962 miles

Procurement method

Budget

Location

Country

United States of America (USA)

State

Missouri

City

Poplar Bluff

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Government, Manufacturing (Industrial), Commercial, Road

Article published date

2024-11-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project