MO/DOT: Route 58 Resurfacing (COC08)
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Job JKU0400 Route 58 CASS County. Resurface from Route 291 to Johnson County line on Route 58 near Pleasant Hill, the total length of improvement being 14.079 miles. The State of Missouri, Department of Transportation, may be seeking a consultant to provide Inspection services for Rte. 291 Pavement Resurfacing
- Status
- Closed
- Sector
- Manufacturing (Industrial), Road, Commercial
- Location
- Raymore, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about MO/DOT: Route 58 Resurfacing (COC08)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Job JKU0400 Route 58 CASS County. Resurface from Route 291 to Johnson County line on Route 58 near Pleasant Hill, the total length of improvement being 14.079 miles. The State of Missouri, Department of Transportation, may be seeking a consultant to provide Inspection services for Rte. 291 Pavement Resurfacing |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Raymore |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Road, Commercial |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
