logo

MO/DOT: Route 61 Resurfacing (COB1B)

Sector: Mass Transit • Location: Troy, Missouri, United States of America

Source: Dodge

Project
Closed

Job JNE0096 Route 61 OR LINCOLN County. Resurface from Route V to Route C near Moscow Mills on various segments of Route 61 outer roads, the total length of improvement being 5.168 miles.

Status
Closed
Sector
Mass Transit, Commercial, Rail, Road, Manufacturing (Industrial)
Location
Troy, Missouri, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about MO/DOT: Route 61 Resurfacing (COB1B)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “MO/DOT: Route 61 Resurfacing (COB1B)” is an infrastructure initiative in the Mass Transit sector, located in Troy, Missouri, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Job JNE0096 Route 61 OR LINCOLN County. Resurface from Route V to Route C near Moscow Mills on various segments of Route 61 outer roads, the total length of improvement being 5.168 miles.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Missouri

City

Troy

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Mass Transit, Commercial, Rail, Road, Manufacturing (Industrial)

Article published date

2025-09-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project