logo

MO/DOT: Route B Bridge Replacement (CO H05)

Sector: Bridge • Location: Van Buren, Missouri, United States of America

Source: Dodge USA

Project
Closed

Bridge replacement over Ten Mile Creek, the total length of improvement being 0.1032 miles.

Status
Closed
Sector
Bridge, Road, Commercial
Location
Van Buren, Missouri, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about MO/DOT: Route B Bridge Replacement (CO H05)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “MO/DOT: Route B Bridge Replacement (CO H05)” is an infrastructure initiative in the Bridge sector, located in Van Buren, Missouri, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Bridge replacement over Ten Mile Creek, the total length of improvement being 0.1032 miles.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Missouri

City

Van Buren

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Road, Commercial

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project