logo
ProjectBidding

MO/DOT: US 24 Pavement Resurfacing

One of 10,000+ projects Taiyo tracks in Florida.

Source: Dodge

Job J3P3158 Route 24 LAFAYETTE County. Resurface and ADA improvements from Lexington to Waverly, the total length of improvement being 18.547 miles.****(2): Job JKR0249 Route 24 LAFAYETTE County. Resurface from Jackson County line to Route 13 in Lexington, the total length of improvement being 16.035 miles.

Status
Prospective
Sector
Road, Commercial, Rail, Mass Transit
Location
Mayo, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about MO/DOT: US 24 Pavement Resurfacing

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “MO/DOT: US 24 Pavement Resurfacing” is an infrastructure initiative in the Road sector, located in Mayo, Florida, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Job J3P3158 Route 24 LAFAYETTE County. Resurface and ADA improvements from Lexington to Waverly, the total length of improvement being 18.547 miles.****(2): Job JKR0249 Route 24 LAFAYETTE County. Resurface from Jackson County line to Route 13 in Lexington, the total length of improvement being 16.035 miles.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Mayo

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Road, Commercial, Rail, Mass Transit

Article published date

2025-03-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project