MO/DOT: US 63 Pavement Improvements (CO B03)
Sector: Road • Location: Moberly, Missouri, United States of America
Source: Dodge USA
Job J2P3351 Route 63 RANDOLPH County. Resurface from 0.3 mile south of Route 24 at Moberly to the Boone County line, the total length of improvement being 15.133 miles. Job JNE0121 Route 24 RANDOLPH County. Resurface from the Chariton County line to 1.5 miles west of Route C near Huntsville, the total length of improvement being 7.495 miles.
- Status
- Closed
- Sector
- Road, Commercial, Manufacturing (Industrial)
- Location
- Moberly, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about MO/DOT: US 63 Pavement Improvements (CO B03)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Job J2P3351 Route 63 RANDOLPH County. Resurface from 0.3 mile south of Route 24 at Moberly to the Boone County line, the total length of improvement being 15.133 miles. Job JNE0121 Route 24 RANDOLPH County. Resurface from the Chariton County line to 1.5 miles west of Route C near Huntsville, the total length of improvement being 7.495 miles. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Moberly |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Commercial, Manufacturing (Industrial) |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
