Modular Offices
Bid results · Quebec · Last reported May 2024
Source: Dodge USA
National Institute of Forensic Psychiatry Philippe-Pinel - #2024-7800-08 / INLPP-2023-02 - Modular offices at 10 905, boul. Henri-Bourassa E. in Montreal. Construction and installation of 7 prefabricated modules (3.65m x 18.25m) installed on a continuous concrete foundation, joined together and connected to the main building by a walkway built on site.
- Status
- Closed
- Sector
- Commercial, Cement, Residential, Government, Manufacturing (Industrial)
- Location
- Montreal, Quebec, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Modular Offices
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | National Institute of Forensic Psychiatry Philippe-Pinel - #2024-7800-08 / INLPP-2023-02 - Modular offices at 10 905, boul. Henri-Bourassa E. in Montreal. Construction and installation of 7 prefabricated modules (3.65m x 18.25m) installed on a continuous concrete foundation, joined together and connected to the main building by a walkway built on site. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Quebec |
City | Montreal |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Cement, Residential, Government, Manufacturing (Industrial) |
Article published date | 2024-07-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
