Modular Processing Plant for US Tungsten Project
Sector: Mining • Location: Nevada, USA
Source: Next Investors
Viking Mines (VKA) has finalized the design of a modular processing plant for its tungsten project in Nevada, USA. The plant is designed for a conceptual processing rate of 43 tonnes per hour and features a modular design allowing additional recovery stages to be added later. Mechanical, engineering, financial modelling, and CAPEX estimates have started, with ongoing testwork to refine OPEX estima
- Status
- Prospective
- Sector
- Mining
- Location
- Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- Next Investors
ConstructChat
Ask ConstructChat about Modular Processing Plant for US Tungsten Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Viking Mines (VKA) has finalized the design of a modular processing plant for its tungsten project in Nevada, USA. The plant is designed for a conceptual processing rate of 43 tonnes per hour and features a modular design allowing additional recovery stages to be added later. Mechanical, engineering, financial modelling, and CAPEX estimates have started, with ongoing testwork to refine OPEX estimates and optimize the plant design. |
Original sector | Mining |
Location
Country | United States of America (USA) |
State | Nevada |
Source
Source | Next Investors |
URL |
More Details
Record type | Project |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
