Modular Restroom Building Install at Kerman Floyd ES
Closed · California · Last reported Aug 2025
Source: Dodge
This Project Consist Of The New Pre-Manufactured Permanent Modular Building. The Construction Shall Consist Of Steel Moment Frames, Wood Stud Exterior And Interior Walls, And Standing Seam Metal Roofing Over Wood Sheathing Over Steel Roof Framing. The Foundation System Shall Be a Slab-On-Grade Floor And Continuous Concrete Footings. The Building Will House Two Single Accommodation Staff Restrooms,
- Status
- Closed
- Sector
- Metal, Steel, Education, Cement, Government, Commercial, Manufacturing (Industrial)
- Location
- Kerman, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Modular Restroom Building Install at Kerman Floyd ES
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This Project Consist Of The New Pre-Manufactured Permanent Modular Building. The Construction Shall Consist Of Steel Moment Frames, Wood Stud Exterior And Interior Walls, And Standing Seam Metal Roofing Over Wood Sheathing Over Steel Roof Framing. The Foundation System Shall Be a Slab-On-Grade Floor And Continuous Concrete Footings. The Building Will House Two Single Accommodation Staff Restrooms, Two Multi Accommodation Student Restrooms, And a Hi-Low Drinking Fountain. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Kerman |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Metal, Steel, Education, Cement, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2025-08-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
