Module 5 Phase E Excavation
Bidding · California · Last reported Sep 2024
Source: Dodge USA
The work, located at the Neal Road Recycling and Waste Facility in Butte County, in general consists of excavating future Module 5 Phase E, reconstructing and widening the adjacent access road, and furnishing and installing drainage structures, all in conformance with the California Department of Transportation 2018 Standard Specifications, and these Special Provisions, unless specified herein. Al
- Status
- Prospective
- Sector
- Road, Government, Commercial, Waste Processing and Treatment, Water Supply and Storage
- Location
- Paradise, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Module 5 Phase E Excavation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work, located at the Neal Road Recycling and Waste Facility in Butte County, in general consists of excavating future Module 5 Phase E, reconstructing and widening the adjacent access road, and furnishing and installing drainage structures, all in conformance with the California Department of Transportation 2018 Standard Specifications, and these Special Provisions, unless specified herein. All work shall include furnishing all labor, tools, materials, equipment, and incidentals necessary... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Paradise |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Government, Commercial, Waste Processing and Treatment, Water Supply and Storage |
Article published date | 2024-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
