MOGADISHU W/S II
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The Second Mogadishu Water Supply Project objectives are to increase MWA's water production capacity and management capability, to extend Mogadishu's existing water distribution system, to investigate water resources for meeting Mogadishu's future water supply needs, and to assess the feasibility of introducing low-cost sanitation facilities in Mogadishu. To accomplish these objectives, the Projec
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Government
- Location
- Somalia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about MOGADISHU W/S II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Second Mogadishu Water Supply Project objectives are to increase MWA's water production capacity and management capability, to extend Mogadishu's existing water distribution system, to investigate water resources for meeting Mogadishu's future water supply needs, and to assess the feasibility of introducing low-cost sanitation facilities in Mogadishu. To accomplish these objectives, the Project includes the following parts: (i) civil works, including extension of source of supply works at the Afgoi Road wellfield, distribution system reservoirs, distribution mains and public taps and test drilling in support of water resource investigations for a future project; (ii) mechanical and electrical equipment including pumping plant for wells and boosters, power supply lines and miscellaneous equipment and supplies; and (iii) technical assistance and consulting services. |
Original sector | Water, Sanitation and Waste Management |
Location
Country | Somalia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Somalia
- Support to Road Authorities in Somalia
- Berbera-Hargeisa-Kalabayd-Togowuchale Road
- Support of mother and child health and improved nutrition in Somalia
- Somalia - Feasibility and ESIA studies, detailed engineering design of upgrading beled Hawa-Dollow/ Luuq road
- Somalia - Feasibility Study, Preliminary and Detailed Engineering Design, ESIA and preparation of tender documents for Upgrading 183-Km Hargeisa-Odweine-Burao Road in Somaliland
- Lign of credit to the Somalia Development Bank
- Somalia - Road Infrastructure Programme (RIP)
- Road Rehabilitation and maintenance project
