logo

Mogi Mirim

Sector: Water Supply and Storage • Location: Brazil

Source: World Bank Group

Project
Active

In June 2008, a consortium led by OHL [Spain], and the utility Sabesp were awarded a 30-year contract to build and operate a 13,000 m3/day wastewater treatment plant in the town of Mogi Mirim, Sao Paolo State. Mogi Mirim had sewerage collection of 90% in 2008, but only had 5% sewerage treatment. During the first phase of the project ending in 2010, collection was expected to reach 25% collection.

Status
Prospective
Sector
Water Supply and Storage, Waste Processing and Treatment, Power Transmission, Government, Power Generation (CCGT), Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Mogi Mirim

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Mogi Mirim” is an infrastructure initiative in the Water Supply and Storage sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In June 2008, a consortium led by OHL [Spain], and the utility Sabesp were awarded a 30-year contract to build and operate a 13,000 m3/day wastewater treatment plant in the town of Mogi Mirim, Sao Paolo State. Mogi Mirim had sewerage collection of 90% in 2008, but only had 5% sewerage treatment. During the first phase of the project ending in 2010, collection was expected to reach 25% collection. The remaining 75% of sewerage collection was expected in three following stages, lasting up to ten years. The contract was awarded in June 2008 under an international competitive tender to the only bidder, the consortium of OHL [Spain, 57%], Sabesp [Brazil, 36%] and minor shareholders. The OHL led consortium presented a tariff 18% lower than what was required in the bidding documents. The tariff was to self-adjust with inflation. OHL held the contract through its subsidiaries: OHL Medio Ambiente, Inima y Tecnicas and Gestion Medioambiental. The total project cost was estimated at US $155.7 million (BRL 285 million), with approximately US $29 million estimated for construction. Construction works began in June 2009. Operations commenced in June 2012. Converted from real to dollar using the market rate, period average for 2008 published by the IMF.

Original sector

Water and sewerage

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Power Transmission, Government, Power Generation (CCGT), Commercial

Article published date

2024-09-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project