logo
ProjectPlanned

Moharda Drinking Water Supply Project Phase 2

Sector: Power Transmission • Location: Jamshedpur, Jharkhand, India

Source: Times of India

The second phase of the Moharda drinking water supply project aims to provide piped water to around 10,000 residents living in the eastern fringes of Jamshedpur by the end of 2026. This phase includes the construction of two overhead water storage tanks with capacities of 2.4 lakh litres and 1.25 lakh litres at Bhuvaneshwari Temple in Telco and old GSR in Birsanagar, respectively, and laying a nin

Status
Prospective
Sector
Power Transmission, Water Supply and Storage, Steel, Power Generation (CCGT), Residential, Government
Location
Jamshedpur, Jharkhand, India
Updated
22 Jul 2026
Source
Times of India

ConstructChat

Ask ConstructChat about Moharda Drinking Water Supply Project Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Moharda Drinking Water Supply Project Phase 2” is an infrastructure initiative in the Power Transmission sector, located in Jamshedpur, Jharkhand, India. Taiyo aggregates data on it from Times of India.

Participants

Sponsoring Agency

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The second phase of the Moharda drinking water supply project aims to provide piped water to around 10,000 residents living in the eastern fringes of Jamshedpur by the end of 2026. This phase includes the construction of two overhead water storage tanks with capacities of 2.4 lakh litres and 1.25 lakh litres at Bhuvaneshwari Temple in Telco and old GSR in Birsanagar, respectively, and laying a nine-kilometre pipeline to supply water to residential areas.

Original sector

Water Supply

Budget

Location

Country

India

State

Jharkhand

City

Jamshedpur

Source

Source

Times of India

URL

More Details

Record type

Project

Sector

Power Transmission, Water Supply and Storage, Steel, Power Generation (CCGT), Residential, Government

Article published date

2025-06-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project