Moheshkhali Floating LNG Terminal
Sector: Water Supply and Storage • Location: Bangladesh
Source: World Bank Group
The project comprises the development, construction, operation and transfer of an offshore marine terminal to support the transfer, storage and regasification of liquefied natural gas (LNG) for delivery to an onshore transfer location in Bangladesh. The Project’s guaranteed base load regasification rate is 500 million standard cubic feet per day (mmscfd) of natural gas. The Project consists of 1)
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial, LNG, Natural Gas, Seaport, Government, Automotive
- Location
- Bangladesh
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Moheshkhali Floating LNG Terminal
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project comprises the development, construction, operation and transfer of an offshore marine terminal to support the transfer, storage and regasification of liquefied natural gas (LNG) for delivery to an onshore transfer location in Bangladesh. The Project’s guaranteed base load regasification rate is 500 million standard cubic feet per day (mmscfd) of natural gas. The Project consists of 1) fixed infrastructure – including a subsea plug connector and mooring system, a subsea pipeline to shore, and tie-in facilities to the onshore Moheshkhali-Anowara pipeline, 2) a floating storage and regasification unit (“FSRU”) with a nominal storage capacity of 138,000 cubic meters of LNG to be chartered to the Project, and 3) the provision of port services to support the transfer of LNG and operations. The Project is being co-developed via a special purpose vehicle, Excelerate Energy Bangladesh Limited (Project Company), by the International Finance Corporation (IFC) and Excelerate Energy Limited Partnership (Excelerate or the “Sponsor). IFC will hold 20% of the equity, with Excelerate owning the majority - 80%. Project cost amounts to $179.5 million. IFC and Excelerate have secured debt financing for the project to help expand access to clean energy in Bangladesh. The equity for the project had been tied up earlier with IFC coming in with a contribution of $10.8 million and Excelerate’s equity amount of $43.1 million. As lead arranger for the project, IFC helped arrange the debt financing package of $125.7 million for the LNG project including IFC’s loan of $32.8 million from its own account and the balance from CDC Group, KfW DEG, FMO and JICA. The funding will support the timely construction and installation of the fixed infrastructure required for the project. The construction of the terminal will commence in the fourth quarter of 2017 and is expected to be in service by mid-2018. https://disclosures.ifc.org/#/projectDetail/SII/38502 http://excelerateenergy.com/ifc-excelerate-energy-secure-financing-bangladeshs-first-lng-project/ http://excelerateenergy.com/ifc-excelerate-energy-secure-financing-bangladeshs-first-lng-project/ |
Original sector | Transport |
Budget |
Location
Country | Bangladesh |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, LNG, Natural Gas, Seaport, Government, Automotive |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Bangladesh
- Bibiyana South CombinedCycle Power Plant
- Maitree Super Thermal Power Project Bangladesh
- Payra Sea Port Dredging Concession
- Chittagong Container Terminal (second contract)
- SAIDABAD RAW WATER CONVEYOR
- Sirajganj 225 MW Combined Cycle Power Plant (2nd Unit-Dual Fuel)
- Moheshkhali Floating LNG Terminal
- Gandharbpur Drinking Water Treatment Plant