MOLDELECTRICA POWER TRANSMISSION
Financed · Moldova, Republic of
Source: European Investment Bank (EIB)
The project will increase the capacity and improve the reliability of the Moldovan electricity transmission system, with the aim of bringing it closer to the ENTSO-E standards. It includes the rehabilitation of some key transmission assets, such as substations, transmission lines and transformers which have reached the end of their technical life. It consists of a large number of individual scheme
- Status
- Prospective
- Sector
- Power Generation (CCGT), Government
- Location
- Moldova
- Updated
- 19 Nov 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about MOLDELECTRICA POWER TRANSMISSION
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | financed |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project will increase the capacity and improve the reliability of the Moldovan electricity transmission system, with the aim of bringing it closer to the ENTSO-E standards. It includes the rehabilitation of some key transmission assets, such as substations, transmission lines and transformers which have reached the end of their technical life. It consists of a large number of individual schemes geographically dispersed throughout the country. |
Original sector | Energy |
Budget |
Location
Country | Moldova |
Source
Source reliability | High |
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government |
Article published date | 2023-05-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
